Pedestrian Bridge Load Study
Modelled a 24 m steel truss footbridge in SAP2000 and compared predicted deflection against hand calculations using the virtual work method.
Read the write-up →Coursework, competitions, and things I've built because I was curious.
Modelled a 24 m steel truss footbridge in SAP2000 and compared predicted deflection against hand calculations using the virtual work method.
Read the write-up →Tested compressive strength across six mixes replacing 0–50% of coarse aggregate with crushed demolition waste. 28-day results and cost analysis.
See the data →Produced a contour map of a 3-hectare site using total station traverse, closing to within 12 mm. Drafted final deliverables in AutoCAD.
View drawings →Sized a drainage network for a small residential development using the rational method, including a detention basin for peak flow attenuation.
Read more →